Sarah Hodgson Sarah Says 30ft, 50ft Dog Rope Leash for Dog Training, Play | Check Cord Long Lead Tracking Line | Heavy Duty for Small,

Add to wishlistAdded to wishlistRemoved from wishlist 0
Add to compare

$14.99

Buy Now

Sarah Hodgson Sarah Says 30ft, 50ft Dog Rope Leash for Dog Training, Play | Check Cord Long Lead Tracking Line | Heavy Duty for Small,
Sarah Hodgson Sarah Says 30ft, 50ft Dog Rope Leash for Dog Training, Play | Check Cord Long Lead Tracking Line | Heavy Duty for Small,

$14.99

Description

DogSupplyHub is supported by readers. When you buy with our links, we may earn a commission. Learn More


Price: [price_with_discount]
(as of [price_update_date] – Details)


[ad_1]
Drag leads are anything but a drag — think of them as stress prevention tools for both you and your dog. When your dog or puppy is attached to the line, you can let him romp and play while still maintaining control. Use it to easily interrupt problem behaviors like jumping and chasing, or soothe a frightened dog both calmly and quickly. This leash comes with its very own ebook (found on whendogstalk.com) that informs you how to teach an off-lead come and solve common behavior problems — all while giving your dog the freedom he desires! It’s 25′ feet of pure magic!
Package Dimensions ‏ : ‎ 12.99 x 3.9 x 1.89 inches; 6.74 Ounces
Item model number ‏ : ‎ 22-MKYB-YVXU
Date First Available ‏ : ‎ March 22, 2022
Manufacturer ‏ : ‎ Sarah Hodgson
ASIN ‏ : ‎ B09W1R6241

INSTRUCTIONAL EBOOK: The leash includes an instructional training video on our site to teach an off-lead come and solve common behavior problems.
50 FEET OF PURE MAGIC! This long lead is the leash you can use to help your dog learn to walk properly. This lead is the 25 feet to allow your dog to love going on walks, not only for you but for them!
35 YEAR VETERAN ANIMAL TRAINER: Sarah Hodgson is the popular author of 14 books, 35 year veteran dog trainer, 20 years as a feline behavioral consultant and educator and corporate speaker with an B.A in Biology with emphasis on Animal Behavior

[ad_2]

Dog Supply Hub
Logo
Compare items
  • Total (0)
Compare
0
Shopping cart